Bespoke Shelters FAQs

What service do you offer if I require a specific shelter design?

We can work with our experienced fabricators to assist in the development of your design concept. However, this depends on the quantity of shelters you require.

How long can it take to develop a design?

A bespoke design depends on the size and quantity of the shelter. On average, from design to completion it can take up to 10 weeks.

What materials are normally used for the shelters?

As with most of our shelters, for the framework we normally use galvanised steel box section and for the glazing panels, we use clear PETG.

How will I receive my shelter?

If not delivered and assembled by ourself you will receive shelters flat packed on a pallet. Please make sure there is sufficient access and space at your site when a wagon/transport vehicle comes to offload the pallet.

Does Tamstar offer an on-site installation service?

For most areas in the UK, we can offer an experienced contractor to install your bespoke shelter.